Robinson Street, from Taylor Street to the north end, is a County-maintained dirt road in Cantonment. This project is currently programmed for design and construction in 2025 and 2026, respectively, under the Dirt Road Paving Program. The unpaved portion Robinson Street will require right of way acquisition from 25 property owners. In some areas, the road is only wide enough for one-way traffic. Currently, stormwater is not managed considering roadside ditches to convey runoff are non-existent.
The project would increase Robinson Street roadway widths and manage stormwater runoff. Ultimately, the new roadway would meet Escambia County standards and have two lanes, each 12-feet wide, with surface and subsurface drainage features.
Currently, a portion of Robinson Street's stormwater runoff outfalls between 848 and 852 Jacob's Way (the Barnett and Eaton parcels), which are lots located within the neighboring Saverna Park Subdivision. Acquisition of these two Drainage Easements are necessary to manage stormwater and to provide an adequate positive drainage outfall route for Robinson Street.
|