Print Back to Calendar Return
    6. 1.    
Board of Adjustment
Meeting Date: 06/15/2016  
CASE:    CU-2016-07
APPLICANT: Wiley C. "Buddy" Page, Agent for Whitney Bank
ADDRESS: 5900 BLK West Nine Mile Road
PROPERTY REFERENCE NO.: 06-1S-31-4201-112-004  
ZONING DISTRICT: LDR  
FUTURE LAND USE: MU-S  
OVERLAY DISTRICT: N/A

SUBMISSION DATA:
REQUESTED CONDITIONAL USE:

Conditional Use to allow a Place of Worship in a LDR zoning district. 

RELEVANT AUTHORITY
:
Land Development Code of Escambia County, Florida (Ordinance 96-3 as amended), Section: 3-2.5 (c) (2) e.

e. Places of worship



CRITERIA:
Land Development Code of Escambia County, Florida (Ordinance 96-3 as amended), Section 2-6.4
CRITERION (a)
General compatibility.  The proposed use can be conducted and operated in a manner that is compatible with adjacent properties and other properties in the immediate area.

FINDINGS-OF-FACT

The proposed place of worship will be compatible with adjacent properties and other properties in the immediate area.  This site is located along an arterial roadway in an area of mixed land uses.
CRITERION (b)
Facilities and services Public facilities and services, especially those with adopted levels of service, will be available, will provide adequate capacity to serve the proposed use consistent with capacity requirements.

FINDINGS-OF-FACT

The level of service and adequate capacity to serve the proposed use are available and will be addressed during the Site Plan Review process.
CRITERION (c)
On-site circulation.  Ingress to and egress from the site and its structures will be sufficient, particularly regarding vehicle and pedestrian safety and convenience, efficient traffic flow and control, on-site parking and loading, and emergency vehicle access.

FINDINGS-OF-FACT

All access to the site, traffic flow, on-site parking and loading and emergency vehicle access will be reviewed during the Site Plan Review process. 
CRITERION (d)
Nuisances and hazards. The scale, intensity, and operation of the use will not generate unreasonable noise, glare, dust, smoke, odor, vibration, electrical interference, or other nuisances or hazards for adjoining properties and other properties in the immediate area.

FINDINGS-OF-FACT

Staff does not find any nuisances or hazards associated with the proposed use.
CRITERION (e)
Solid waste.  All on site solid waste containers will be appropriately located for functional access, limited off-site visibility and minimal odor and other nuisance impacts.

FINDINGS-OF-FACT

Solid waste service is available and container locations will be determined during the Site Plan Review process. 


 
CRITERION (f)
Screening and bufferingWhere not otherwise required by the LDC, screening and buffering will be provided if appropriate to the proposed use and site.

FINDINGS OF FACT:

Screening and buffering standards will be reviewed during the Site Plan Review process.
CRITERION (g)
Signs and lightingAll exterior signs and lights, whether attached or freestanding, will be compatible with adjoining properties and other properties in the immediate area, especially regarding glare and traffic safety.

FINDINGS OF FACT:

All exterior signs and lights will be reviewed during the Site Plan Review process and must meet LDC requirements.
CRITERION (h)
Site characteristics. The size, shape, location and topography of the site appear adequate to accommodate the proposed use, including setbacks, intensity, bulk, height, open space and aesthetic considerations.

FINDINGS OF FACT:

The proposed Conditional Use is consistent with all other relevant provisions of this Code.
CRITERION (i)
Use requirements. The proposed use complies with any additional conditional use requirements of the applicable zoning district, use, or other provisions of the LDC.

FINDINGS OF FACT:

The proposed Conditional Use is consistent with all other relevant provisions of this Code.
 
STAFF FINDINGS
Staff recommends that the Board approve the proposed Conditional Use request with the following condition:

This project must meet any conditions imposed through the Site Plan Review process.
BOA DECISION
 The Board adopted Staff's findings and approved the Conditional Use with the following condition:

This project must meet any conditions imposed through the Site Plan Review process.
Attachments
Working Case File CU-2016-07

AgendaQuick©2005 - 2024 Destiny Software Inc., All Rights Reserved