The Engineering Department, in coordination with ECUA and David Fitzpatrick Engineering, will complete the construction plans for the Chemstrand Road (Nine Mile to Ten Mile) Pedestrian and Drainage Improvement Project, also known as Chemstrand Road (Nine Mile to 10 Mile) Sidewalks, to provide pedestrian facilities, bike paths, drainage improvements, and roadway reconstruction along Chemstrand Road between Nine Mile Road and Ten Mile Road. Sidewalks will begin at the north end of the existing sidewalks just north of Nine Mile Road and will tie to the existing sidewalks just south of Ten Mile Road. Approximately 3,915 linear feet of sidewalks will be added to each side of the road, totaling over 7,800 linear feet.
To facilitate sidewalk construction, existing drainage will need to be modified and new drainage features will be installed throughout the project. The additional drainage features will conflict with existing utilities and an Interlocal Cost-Sharing Agreement with ECUA will be utilized to share the cost to improve an existing potable water system that requires replacement.
Since the County and ECUA have identified funds to proceed with construction, this Interlocal Cost-Sharing Agreement is prepared to establish a budget for reimbursement funds, in a not-to-exceed amount of 50% of the replacement costs, estimated to be $100,000, from ECUA. After bids are received, percentages may be adjusted as needed to reflect actual bid costs instead of estimated construction costs.
|