The proposed Drainage Easement submitted for acceptance by the Board of County Commissioners is for the purposes of constructing a drainage system to provide positive outfall for a section of Bronson Road. This portion of Bronson Road is approximately 1,700 linear feet south of Lillian Highway.
Following construction and final plat approval of the Reunion Place Subdivision by the Board of County Commissioners on August 16, 2018, staff received several drainage complaints from residents adjoining the east side of Bronson Road, reporting yard flooding from the roadside ditches due to inadequate outfall. One resident recalled that a culvert at the intersection of Lillian Highway and Bronson Road had apparently been removed by Florida Department of Transportation as part of a shoulder widening project in the late 1990s. Another resident reported that water from the roadside drainage ditch flowed through an open ditch along their property to the east through wetlands towards Bauer Road.
County staff investigated several drainage options to determine the best approach to address the reported and verified drainage issues experienced by the residents along Bronson Road. Multiple easement options were considered. It was determined with designed flow elevations and minor grading and stabilization, this one Drainage Easement could drain runoff from Bronson Road to the west, to a positive outfall, across property owned by Pensacola Christian College, Inc., whose principals agreed to donate.
|